Showing posts with label Livability. Show all posts
Showing posts with label Livability. Show all posts

Tuesday, January 1, 2019

We Did It! The Roost Artists Live-Work Lofts is Complete

In early December, we crossed an important threshold, leasing up our last remaining apartment as well as signing up an arts non-profit for our commercial space. That milestone represents the completion of a four year effort to design and develop The Roost, a first-of-its-kind artist's live work micro-housing development.

The Roost has 33 units with 34 residents, 7 dogs, 2 cats, and is home to about two dozen working artists. Our residents share kitchens, living, dining, co-working and laundry rooms. Nine of our residents live in units that are subsidized through Seattle's MFTE program, capping their rent at $702/mo. The market-rate units rent for an average of around $1200/mo.

Images from the 2018 Women's March, featuring artwork produced and distributed by Amplifier
The Roost is also the new home of Amplifier, a non-profit media lab that helps connect artists with social change movements to design, produce, and distribute art and media that helps those movements reach a wider audience. Bringing Amplifier to The Roost is the culmination of a years-long effort with Seattle's Office of Arts and Culture to identify a non-profit arts institution whose activities could provide interest and inspiration to our tenants. We hope this collaboration ican serve as a model for how new development can help support arts and cultural institutions in Seattle.

It has been a lot of work getting to this point, and we were at times uncertain if we would be able to pull it off. Having finally crossed the finish line, it's worth taking a moment to reflect on what we have accomplished and to share some of the lessons we learned along the way.


Background
Four years ago (November 2014) we purchased a 4000 sf lot near the future Rainier Light Rail Station with the intent of developing our first micro-housing project. Our starting point was the community micro-housing model that we first conceived for projects like the Yobi. These early projects paired compact, affordable private sleeping rooms with generous common areas arranged to promote chance interaction and help build community among the residents. We aimed to push this form of housing beyond its utilitarian roots, improve the general design quality, and explore the inherent opportunities and challenges that are created when people live in community with one another. We described this effort as Microhousing 2.0.

Could we design housing that helped build friendships, social capital, and quality of life? Our first intuition was that we might be more successful if we could assemble a group of residents that shared some common interests and/or challenges. So we looked around the neighborhood and tried to imagine what a natural resident cohort might look like. With projects like Hiawatha Artspace next door, Pratt Art Institute nearby, and work spaces like Inscape and Rainier Oven within a short walk, we saw a natural opportunity to create artist's housing that could have a symbiotic relationship with these exiting arts institutions.

At the time, Artspace had 150 rooms available in Seattle with over 1000 artists on a waiting list. Projects like Artspace are an important but scare resource, accessible only to those patient and lucky enough to get a spot. We saw an opportunity to create a market-rate analogue to Artspace's non-profit development model; aimed at helping the same group of people but with a solution shaped by the toolkit that we have at hand. Artspace provides large generous units to its residents, charges its commercial tenants market rate, achieves affordability through federal tax subsidies and insures those subsidies benefit artists by screening applicants through a portfolio review. The Roost, by contrast, would achieve affordability through space efficiency and shared resources. We would use conventional private financing, charge market rate for our rooms, and use Seattle's MFTE program to achieve a deeper level of affordability. We would provide subsidized commercial space to attract an arts-oriented anchor tenant. Our doors would be open to anyone, so we would have to find ways to attract artists to the project via marketing and outreach.

Early Design Concepts
Our earliest designs featured three upper stories of small (160sf) studios with a main floor dedicated mostly to a large common work room. The idea was that residents could live upstairs and work together downstairs in the common studio. This vision was a natural extension of our own past experiences as architecture students working in large shared studios. We took the earliest sketches of this idea around to a range of schools and institutions (Pratt, UW, SEED, Equinox, Artspace) with experience providing artists work space. The feedback was not encouraging: Artists work in a variety of media, at all hours, often with specialized, expensive tools and supplies. They have unique personalities, a fierce devotion to their work, and a need to protect the fruit of their labors. Accordingly, almost every institution that provides artist work space provides it in the form of four walls with a door and a lock. Our vision of a gleaming storefront space full of artistic collaboration and creative foment needed a bit of re-thinking.

An early planning concept for the main floor featuring a large common work room.


We published our plans online and sent a survey around to get feedback directly from prospective tenants. Some respondents found the idea intriguing. Many artists were suspicious of our intentions, which was generally presumed to be some sort of artwashing scheme. One pearl of wisdom that we gleaned from the outreach: Respondents put a much higher priority on living in a building with other artists than on working in a building with other artists.

Based on the feedback, we shifted gears a little bit. We gave up on the common work room and redesigned the main floor to have a conventional commercial space that we would reserve for an arts-oriented tenant. Having lost the common work area, we put a little bit of that work space back into each unit. We turned the upper three stories into two levels, but made each unit double height to accommodate a small bed loft. Lifting the beds up off the main floor opened up a small space for a work area within each unit - a miniaturized live-work loft,




Walking the Walk
Throughout the process we have had to live with a degree of uncertainty about the outcome. While we have always had a high level of confidence that we could make the project work as a conventional housing development, right up until the last we didn't have a clear sense if we could actually deliver on the promise of creating an arts community. It's one thing to want artists to come live here, but whether or not they will take up the invitation is another matter entirely. We offered up our storefront at reduced rent to arts institutions, but two years of matchmaking during the design and construction phase didn't produce much beyond a series of first dates. As the project approached completion, we sat down with our property manager to discuss a lease-up strategy, and a contingency plan.

We completed construction and got permission to occupy the building in mid-August. Summer and early Fall is considered a great season for leasing apartments. A conventional lease-up strategy would immediately buy up a lot of advertising and focus on getting the units leased before the slow season arrived.  In our case, we felt our best chance to establish the project as an arts building would be to make sure that the first crop of tenants included as many artists as possible. So, rather than advertising broadly on general media sites like Craigslist and Zillow, we wanted to do our early outreach directly to artists.

We found ourselves at a junction where the project's financial best interests (quick lease-up) were in direct conflict with the projects stated goal (arts community), so we had to do a little soul searching paired with some spreadsheet work. We ultimately decided that we could afford to give artists a six-week head start and stick with our guerrilla marketing plan through October 1, at which point we would need to switch over to a conventional marketing strategy to get our units leased up and start paying on our bank loan.

Lease-Up
We reached out to over 60 arts non-profits and 35 galleries to use their bulletin boards, reception counters, telephone poles, and online social networks to spread the word about the project. We blogged, handed out postcards, and tacked up posters outside of art supply stores and art schools. We got enormous help from a few key institutions like SEED Arts, Artists Trust, Equinox, and Artspace. Slowly at first, and then more steadily, artists began to find the place. By the time October 1 rolled around, ten of the units were rented up, with artists living in seven of them. It was a promising start, but we were out of time and needed to move on. Conventional advertising had to begin. How many more artists would show up? We were just going to have to find out.

In early Fall we finally caught a lucky break on leasing the commercial space. Amplifier was looking for a new headquarters, and the Seattle Office of Arts and Culture helped connect the dots. We began working on an agreement to get them into The Roost, and the match finally took. We got ourselves a dream tenant, and the final pieces began to fall into place.

In October and November, the building continued to lease up steadily at the rate of about 3 units per week. We wanted to know how many of the later lease-ups were artists. It's not easy to know. When people apply for an apartment, they declare their income and where they work for a living, but very few working artists make their primary living through their art, so you don't really know if someone is an artist until you get a chance to ask them directly. To answer the question more accurately, we are conducting a tenant survey. While the information is still coming in, so far (with a 75% response rate) about 85% of our respondents identify as artists.

What's Next?
Our development projects provide us a laboratory to push new ideas and experiment in a way that isn't always possible in our client driven projects. The Roost is the first of a series of micro-housing projects where we are both the architect and the developer. These projects provide an opportunity to test new ideas in the marketplace, and enhance our subject matter expertise for this kind of housing. Operating the buildings is a unique opportunity to learn more about the day-to-day lives of our tenants, and deepen our understanding of this specific housing type. It is a form of research that can help us improve our future projects, guide our clients more effectively, and speak with more authority in our public advocacy role.

1501 NW 59th St - Construction to Begin Spring 2019

8311 15th Ave NW - Shared Residential/Commercial Courtyard

8311 15th Ave NW - Under Construction. Completion Jan 2020.

Credits

Neiman Taber Architects Design Team: David Neiman, David Taber, Elizabeth Pisciotta, Patrick Taylor, Kyle Jenkins, Juan Vergara, Erin Feeney, Sharon Rubin.

General Contractor: STS Construction Services

Consultant Team: Malsam Tsang (Structural); Sitewise Design (Civil); Pacific Landscape Architecture (Landscape); Geotech Consultants (Geotech); Evergreen Certified (Built Green); Solarc Energy Group (Energy Modeling); Chadwick and Winters (Surveyor).







Wednesday, March 16, 2016

Beautiful Density: Housing Design for a More Liveable City



Seattle was built out as a city of single family homes, but that model has run its course. Most of our new inventory is coming in a denser form – rowhouses and townhouses. As a city we have resisted these changes socially and politically, at great volume. Why are we so unhappy with these new housing forms? To borrow a phrase…It’s the car stupid! To be more precise, it’s the negative effect parking has on the design and configuration of our housing, creating homes that are less livable and less beautiful.

So, how can we build a denser city as appealing as the single family fabric that came before it, while managing all the cars?  Read my new article at Crosscut to find out!

Saturday, March 12, 2016

Marion Green Presentation at NW Eco-Building Guild's 2015 Green Building Slam




We were honored to be included in the NW Eco-Building Guild's 2015 Green Building Slam.  The event featured ten projects; each presenter got ten slides and ten minutes.  It was a great opportunity to show off Marion Green to a large audience of our fellow architects, builders, developers, and green building enthusiasts. Click here to see a video of the presentation

The project was really well received.  It is my hope that events like this (and my relentless self-promotion!) will help spread the word about this important new housing type and help speed its adoption in the marketplace. We are working on an article for the Eco-Building Guild's Code Innovation Database that will document they ways we navigated this project through the land-use and zoning code so that others can more easily follow.

Speaking of which, our next courtyard project, Olympic View, is speeding its way toward completion.  Check it out here.

Thursday, December 31, 2015

Olympic View Townhomes - Courtyard Meets Panorama



Marion Green, our previous courtyard townhouse project with Paar Development, won a PSRC Vision 2040 award and was featured in the 2015 Green Building Slam. Our next project, Olympic View Townhouses, takes one more step forward, refining the courtyard townhouse concept and adapting the idea to a stunning hillside view lot on the south slope of Queen Anne Hill.

Olympic View features twelve (12) new townhouses, ranging in size from 800 sf one bedroom units to 2100 sf three bedroom units.  The shared central courtyard is the most spacious that we have ever designed and covers a parking level that accommodates 14 cars.  What makes Olympic View unique among our projects is the way we have adapted the courtyard townhouse concept to a sloping site, stepping the project down the hillside.  The terraced cross section allows each unit to see over the top of unit below, providing panoramic views of the Space Needle, downtown, and Puget Sound from the upper living levels and the rooftop decks

Like its predecessors at Marion Green and Beacon Green, the common courtyard creates an elegant way in and out of the homes, hides the parking area, provides generous open spaces and establishes a setting where neighbors have the regular contact with one another that helps to build familiarity and community.

The project will be built in two sections of six units each, with a common pedestrian entry walkway connecting the two halves.  The project will be certified 4 star built-green construction, which requires improved energy efficiency, low voc interior finish materials, green stormwater management, low water use, and a host of other sustainable features.

See Olympic View Project Site at: http://olympicviewtownhomes.com/



Wednesday, October 7, 2015

Forget reinventing...How about re-legalizing Microhousing?

Casey Jaywork from the Seattle Weekly wrote a great article last week describing how Seattle has all but banned the production of congregate micro-housing and has refused to take up the HALA committee recommendation to revisit this policy. The article features a discussion of our Yobi Apartments project and how last year's micro-housing legislation has made it all but impossible to develop more projects like the Yobi.


The article used data from a DPD housing report that captured production through May of 2015.  I took that report and updated it to the current day, filling in some missing projects and adding in all of the 2015 pipeline. Here's what I found:

Annual Totals
Congregate
Units
SEDUs
2010
79
0
2011
168
0
2012
755
32
2013
1804
82
2014
1203
251
2015
124
902

One surprise: Virtually all of the new congregate housing projects are coming out of our office.  This has nothing to do with us capturing market share; our workflow on congregate housing projects has been fairly stable. Rather, it is a reflection of the rest of the market being driven away from congregate micro-housing and shifting their efforts over to SEDU production.

Thursday, August 20, 2015

Calling All Artists! - Reinventing Microhousing Part II

We need your input - Artist Survey!


We recently started design for ArtWorks, our latest design + development effort since completing our award winning Marion Green Townhomes. Artworks explores the intersection of affordability with livable communities.  We are continuing our earlier work on micro-housing, this time to serve the needs of the local artist community.

As Seattle struggles with affordability within the urban center there is a clear need to provide affordable housing for artists. There are various models for that to happen, including subsidized housing (slow and limited funding available) and co-op housing (difficult to coordinate financially and legally), but these models will never come close to meeting demand. The Artspsace program, for example, currently has a waiting list of over 1000 people for their 150 units. The model that our firm is exploring with Artworks is based on a congregate residence similar to what we designed for the Yobi Apartments, where each individual rents a small, affordable personal live/work space and enjoys access to a larger communal creative space. Artists are a group that both needs affordable housing and could benefit from a communal living arrangement that brings artists together to share work, ideas, events, and creative foment.

The Artworks site is located across the street from the Artspace Hiawatha Lofts at South Charles Street and Hiawatha Place South in the lower Central District.  This map shows some of the neighboring art facilities and institutions that will be part of the network of resources available to Artworks tenants:


The building is composed of 33 sleeping units over 3 floors plus a daylight basement. Each resident will enjoy a storage loft in their unit, a common kitchen on each floor, and a main floor commons including a lounge, kitchen and laundry. The street level space is dedicated for a tenant that can provide a facility that would provide an amenity useful to working artists.  At this time, we are hoping to find an organization that focuses on some aspect of digital arts, such as a computer lab, maker space, 3d printing and fabrication, or other related facility.  We are willing to provide space at below market rent in exchange for finding tenant that is a good fit and can be of use to our tenants. Please contact our office if you or an organization you know may be interested in renting the space when the project is complete.  




In addition to looking for a tenant partner from within the arts community, we are seeking feedback from the creative community and area stakeholders on the current Artworks proposal. Artists, please tell us what you think and share this survey with others who might be interested in the Artworks project.





Follow-up: Unit sizes range from small basement units at around 150sf to lofted units ranging from 200-300sf.  Small units are expected to rent for around $700/mo.  Lofted units are expected to rent from $850-$1000/mo.  If the city follows the HALA recommendations and changes the rules to allow congregate housing to participate the Multi-Family Tax Exemption program, seven units would have rents capped at $620/mo.

Sunday, July 26, 2015

Reinventing Microhousing - Yobi Apartments Open House Tour Aug 25th 5:30-7:30pm (NEW DATE)


NOTE - DATE HAS CHANGED: AUGUST 25TH 5:30-7:30PM  - 1219 E MARION ST

The Yobi Apartments is finally ready.  This project has been much discussed as a new model for how to build microhousing in Seattle.  The Yobi was designed from the ground up with the conviction that congregate housing can be a desirable housing option where the architecture and the shared features can support chance interaction and help to build community among the residents.  For microhousing proponents and critics alike, we welcome you this open house to learn more about microhousing and what it can be.

Event Invitation and RSVP:
https://www.eventbrite.com/e/reinventing-microhousing-come-tour-the-yobi-apartments-tickets-17914814693

Some related reading:

Our original post describing the project:
http://neimanarchitects.blogspot.com/2013/03/re-inventing-microhousing.html

A review of microhousing code issues and basic metrics:
http://www.theurbanist.org/2014/09/18/an-architects-perspective-the-details-of-microhousing-projects/

A discussion of the The Yobi's sustainable features and energy use:
http://neimanarchitects.blogspot.com/2015/02/re-inventing-microhousing-yobi.html


Should the Seattle City Council revisit restrictions on micro-housing?
http://www.seattlemet.com/articles/2015/7/17/hala-report-calls-for-modifying-barriers-to-pod-apartments

Thursday, July 16, 2015

Marion Green Wins 2015 PSRC Vision 2040 Award




We had a little party today to accept a Puget Sound Regional Council Vision 2040 award for our Marion Green Townhouses. The homes were completed a few months ago, but this is a project that has been more or less nine years in the making.

In 2006, Scott Clawson and Todd Allan walked into my office with a piece of land. They wanted to build a little townhouse project, keep one unit for themselves & hold the other two as rentals.  At the time I was just starting to get into development projects.  I knew very little about townhouses, just enough to be aware that virtually every project was built in the same way:  Build units in the front, units in the back, and the center of the site is a driveway zone that gets you to the parking garages.  Scott and Todd asked me if I could design them one of these. I took one look at the cross section of the building & said "well, you could, but this is a really bad housing design.  Why not just cover the center with a deck?  That would hide all of the car parking & the center of the project becomes a community open space that you all enjoy."   Simple, right?

Turns out why not is because this concept violated about a dozen development standards of Seattle's land use code.  To do this simple little project we had to volunteer go through the design review process to get permission to depart from all of the various standards that we’d need to get the project done.  All told it took over two years to get our permit approvals, and by the time we work our way through the process, it was the fall of 2008, which you may recall was when the entire economy collapsed.  Bank financing dried up, the project foundered, and never got built.

I was upset that we didn’t get this little jewel of a project built but even more so that as a city, our codes were wound so tight that it was a “good ideas to the back of the line” kind of situation.  As it turned out, the Department of Planning and Development was of a similar mindset, and beginning to study a re-write of the multi-family code.  It was becoming clear that we needed to liberalize our land use code if we were going to make good housing possible.  I spent the recession organizing a group architects to work with the city on the code language, and also to go out into the community to give presentations, explain the code changes and why they were necessary.

By 2011, we had a new code in place, and as it turned out I was the person who had spent the most time reading it.  This gave me an opportunity to meet a lot of developers who came to me to ask what was possible under the new code.  This is how I met Joe Paar.  He was one of the first people that recognized the value of combining technical code knowledge and design skill to develop more successful projects, in every sense.  When I decided to develop my first project, I needed a partner to help make the finances work.  Joe was the guy that I asked for help & within a couple minutes discussion we were off to the races.  Joe was a true partner at every step of the way, and he deserves a lot of credit for getting this project successfully to the finish line.

All told it took nine years from the first sketch to where we got to stand in the courtyard with the project team and take a victory lap.  From the outset my goal was to build a better mousetrap:  Provide a replicable model for a better way to do infill housing in Seattle. I truly believe we’ve done that.  We’ve found a way to hide the cars, create more open space, break down project scale, bring more natural light into the homes, and most importantly, provide a commons that helps facilitate and build community among the families that share this little plot of land.  I'm also happy to say that other people have started to pick up on this model.  There are now four other courtyard lid projects in the works, two by our office, but two others by different architect/developer teams. It is my hope that the recognition that we are received today will help to spread the word and speed the adoption of this new housing archetype in the marketplace.

Thank you to the residents of Marion Green for sharing you home with us today. I hope you enjoy living in Marion Green as much as we enjoyed making it for you.

Project Team:
Architect:  David Neiman and Juan Vergara - Neiman Taber Architects
Developer:  David Neiman and Joe Paar - Paar Development
Structural Engineer:  Jim Harriott and Benjamin Bird - Harriott Valentine Engineers
Landscape Architect: Patricia Lenssen - Philbin Landscape Architects
Geotechnical Engineer: Rob Ward - Geotech Consultants
General Contractor:  Peter Ottele and Doug Scheer - Village Builders
Strategy and Marketing:  Joe Paar - Paar Development
Sales Agent:  Jacob Menashe - Berkshire Hathaway










Friday, June 5, 2015

Madison Apartments Update


Neiman Taber and the Philbin Group presented the Madison Apartments project to the East Design Review Board for a recommendation meeting on March 25th. At the Early Design Guidance meeting last summer, the project was well received. However, the Board asked us to provide the following:
  • Studies of the parking area and trellis in elevation and perspective.
  • Well managed connection between two building masses at the corner of 23rd and Denny
  • Demonstrate a contextual response and sustainable focus within the neighborhood.
The project proposes a landscape wire trellis over the parking area and a landscape screen wall to the east. The screen wall will be a black 4” x 8” welded wire mesh fencing with steel vertical posts. The horizontal trellis above the parking court will be a stainless steel cable, tensioner and clevis system. Virginia creeper plantings will provide screening from the parking area for residents in the building and to existing neighbors to the east. 

East Elevation



At the intersection between the Madison and Denny facades, the project celebrates the corner with a façade that is more transparent, features a double height retail space, and expresses the geometry of the site by featuring a sharp prow that is typical of triangular sites in the Madison corridor.
The transition from the corner prow to the Denny façade has been made larger to create some visual space between the two masses and allow them to resolve in a more successful fashion. Planting will provide an accent between the buildings. 


The project intends to provide a number of features to create a visually interesting and friendly pedestrian environment along all three sides of the building. 


Aerial View Looking East

At the residential level, large windows and balconies bring eyes and human activity to the face of the building and increase natural surveillance of the public realm. Along the Madison corridor, the façade design features large storefronts, projecting / stepped awnings, and a certain degree of visually dynamic asymmetrical composition.  

Perspective Looking Across 23rd Avenue 

Street level notches are the minimum size required to provide accessible entries along a sloping right of way. Street level uses have generous glazing and clear sight lines that create natural surveillance of these notches. 

Perspective Looking Up Madison 
Along Denny, the project uses similar materials as Madison Ave, but there is no expressed storefront base, no continuous canopy, and the composition is more ordered and quiet. The residential mezzanine level reduces the visual impact of the parking garage and the height of the blank wall. 

Perspective Looking Down Denny Way
The project provides a residential access alcove that brings pedestrian activity to Denny. There is a 2’ continuous planting bed between the building and the sidewalk.

Residential Entry
The project has been designed to accommodate small floor plates which allow the building to adapt to the difficult slope and corner nature of the site. The narrow floor plate creates units that are designed to maximize access to natural light. 


The project has been specifically designed to step the lower levels of the building in order to adapt to the sloping public way.  This stepping allows for a more porous edge along the Madison commercial corridor. 



The scale transition from our project to the adjacent Crush restaurant was discussed by the board, who concluded that the scale transition was not of concern. The project has been designed to zone commercial activity to the Madison side and residential activity to the Denny side. Rooftop amenity areas have been located on the Madison side of the project to be farthest away from the neighboring residents. The visual impacts of blank walls have been minimized.  The NE blank wall features unit balconies that create depth and shadow, and a composition of colored panel siding to add visual interest. The SE blank wall features a frame-infill pattern that echoes the Denny facade.  A portion of this wall has been set back three feet to allow for windows in the façade to increase visual interest.


Aerial Looking West

The project received high praise from neighbors and the Board. They acknowledged the hard work the design team did to successfully develop a challenging site, provide housing and commercial opportunities that are scaled to the needs of the neighborhood, and create a high quality building. We expect permits to be ready for July 2015 start of construction.



Wednesday, April 22, 2015

Re-Inventing Micro Housing - Tour this Saturday 11am-5pm

This Saturday, April 26th, the NW Green Homes Tour is featuring The Yobi Apartments, a new congregate micro-housing project (about 90% complete) that we designed from the ground up around the goal of facilitating chance interaction and fostering community among residents.  I hope you'll be able to stop by to take a look.

Tour information:
Yobi Apartments - 1219 E Marion St - April 26th 11am-5pm.  FREE!